Peerzada Sayeed
Karnah valley has received fresh snowfall after continuous rainfall from last four days as per reports atleast 1 feet of snow has been recorded at sadhna Top.Due to this many inhabitant of Karnah has been stuck at sadhna top the relatives of the stranded people are very worried. due to heavy rain many foot over bridge bridges has been collapsed like river Nala Bata Maji Due to the rapid flow of the Bata Naji river foot over bridge has collapsed inhabitant of connected villages are worried as well as the foot over bridge in Surma Padi also falled down beside this the main road and the link roads are going to be damage day by day very hardly people travels one place to another because of heavy rain for the last few days.